Coed Bach Layout Build – 2024

January – New workshop building at the mine.
February – Hill above the mine now built and grassed. Just needs fencing, bushes, trees and sheep.
March – Additional lighting controllers added.
March – More lighting.

A short video of locos running on the layout.

April – A draft Mimic Panel installed. Additional switches and cabling to the points need to be added before I get a proper front panel.
May – more cabling run to connect point motor controllers to the Mimic Panel plus three new Cadbury wagons.
June – New early pannier tank 2783

A new track has been planned with two layers connected by a helix at each end. This will 6.4m x 3.4m. The bottom level will have all the storage yards for trains.

Coed Bach mk2

Work on the new layout started with the first two baseboards in August.

 

2023     Build  >