Coed Bach Layout Build – 2022

The initial idea for the layout in February 2022.
March – Inner loop is complete and wagon siding and goods shed roads are laid.
April – Ballasting of track started and track for local trains into the station laid.
May – Illuminated Engine Shed
Cliff face by wagon siding under construction.
June – Goods Yard and Coal Merchant.
Town building plan
July – Details added to Goods Yard, cliff faces painted and top of hill now has greenery.
August  – Rock wall, planting details and culvert added at the end of the wagon sidings.
Additional tracks laid in station area.
September – Church built and sited.
First row of shops completed.
October – Mine sidings laid and incline base put down for outer two circular tracks.
Signal Box
November – Main platform sited.
December – Detailing added to church and static grass added to lineside.

2023 Build  >