Coed Bach Layout Build – 2022 The initial idea for the layout in February 2022. March – Inner loop is complete and wagon siding and goods shed roads are laid. April – Ballasting of track started and track for local trains into the station laid. May – Illuminated Engine Shed Cliff face by wagon siding under construction. June – Goods Yard and Coal Merchant. Town building plan July – Details added to Goods Yard, cliff faces painted and top of hill now has greenery. August – Rock wall, planting details and culvert added at the end of the wagon sidings. Additional tracks laid in station area. September – Church built and sited. First row of shops completed. October – Mine sidings laid and incline base put down for outer two circular tracks. Signal Box November – Main platform sited. December – Detailing added to church and static grass added to lineside. < 2023 Build >