Coed Bach Layout Build – 2023

January – A start on the footbridge and station buildings.
February – Grass and fencing completed around the forge.
Footbridge extended.
The buildings in the town have grown.
March – Fire station added.
April – Updated layout overview.
May – A start made on the mine entrance and cliffs.
July – The four corner shops are now all completed.
August – D. Roberts and Son – Timber Merchants
September – the cutting leading to the lower tunnel mouth is taking shape.
November – Coal loading chutes at the mine.

2022 Build     2024 Build  >