Coed Bach Layout Build – 2023 January – A start on the footbridge and station buildings. February – Grass and fencing completed around the forge. Footbridge extended. The buildings in the town have grown. March – Fire station added. April – Updated layout overview. May – A start made on the mine entrance and cliffs. July – The four corner shops are now all completed. August – D. Roberts and Son – Timber Merchants September – the cutting leading to the lower tunnel mouth is taking shape. November – Coal loading chutes at the mine. < 2022 Build 2024 Build >